Power Nickel Inc. (the “Company” or “Power Nickel”) (TSXV: PNPN) (OTCBB: PNPNF) (Frankfurt: IVV) is pleased to announce the beginning of the 2025 winter drill campaign on the Nisk project with hole PN-24-96 (Figure 1). This hole will be testing the depth extension along the trend of the Lion zone, following up on successful drilling of high-grade Cu and precious metal (Pd, Pt, Au, Ag) discovered in 2024 drill holes (See some highlights below and Table 2).
-
PN-24-047 contains 14.40m of 8.15% Cu; 6.23 g/t Pd; 8.40 g/t Pt; 68.9 g/t Ag; 0.59 g/t Au; and 0.58% Ni
-
PN-24-051 contains 11.40m 0f 2.51% Cu; 3.20 g/t Pd; 19.59 g/t Pt; 14.0 g/t Ag; 0.24 g/t Au; and 0.58% Ni
-
PN-24-053 contains 5.00m of 12.70% Cu; 20.87 g/t Pd; 1.02 g/t Pt; 102.9 g/t Ag; 1.76 g/t Au; 0.40% Ni
-
PN-24-070 contains 32.00m @ 3.62% Cu; 8.10 g/t Pd; 2.47 g/t Pt; 20.9 g/t Ag; 0.45 g/t Au; 0.18% Ni
Note: Reported lengths are downhole distance; true width based on model projections is estimated as 85-95% of downhole length
The 2024 drilling has begun to delineate a deposit that is analogous to Cu rich deposits that form an end member type of deposit found in large Ni deposit camps, such as those observed at Norilsk and the off-set dyke style deposits in Sudbury. The presence of a Ni-Cu-Co-PGE deposit (Nisk), and a Cu-PGE-Au-Ag deposit (Lion) along the same layered ultramafic unit provides encouragement to target additional, possibly larger, deposits within this camp. Power Nickel’s current exploration information is suggestive of a potentially large volume of metal yet to be discovered.
To achieve these discoveries the current plans for the winter 2025 exploration campaign include operating 3 drills by mid February. The initial drill will extend depth and strike extensions of the Lion deposit. The remaining two drills will target the known strike of the ultramafic, including 5.5 km of strike between Nisk and Lion that has not previously been drilled. This area includes structures and EM anomalies that are similar to the original target that led to the discovery of Lion in late 2023. In addition, the Nisk Ni deposit remains open to expansion, with some of the best intersections found in the last drilling campaign at Nisk (2023) that targeted depth extensions. Additional drilling is expected to increase the 2023 NI43-101 mineral resource estimate, and to help understand Nisk’s connection to the high grade Lion Cu deposit.
To help direct the exploration drilling Power Nickel has retained the services of a geophysicist to review borehole EM surveys and ground EM surveys that were conducted in 2024. This work will identify new drill targets for the 2025 campaign. Several holes west of Lion (PN-24-082 to 85, Figure 1) are the initial locations for borehole EM surveys and these will be prioritized when the second drill arrives at site at the beginning of February.
Continue at Power Nickel