Kodiak Copper Corp. (the “Company” or “Kodiak”) (TSX-V: KDK, OTCQB: KDKCF, Frankfurt: 5DD1) reports the first drill results from the 2025 drill program at its 100% owned MPD copper-gold porphyry project in southern British Columbia. The program focused on near-surface infill and confirmation drill holes at the West, Adit, and South Zones using a combination of diamond and reverse circulation drilling (“RC”). Results from 22 RC holes at the South Zone totalling 2,746 metres are presented herein.
View Video of CEO Claudia Tornquist and VP Dave Skelton Discuss the News
Highlights:
- Kodiak’s 2025 drilling at the South Zone confirmed near-surface copper-gold mineralization over 950 metre strike length at this extensive zone (Figures 1 & 2).
- The South Zone remains open in multiple directions and at depth, with all 2025 drill holes ending in mineralization and most drilling completed to date within 250 metres of the surface.
- South Zone drill result highlights include (Figures 1 & 2):
- RC-AXE-25-010 intersected 0.39% Cu, 0.10 g/t Au and 1.63 g/t Ag (0.46% CuEq) over 111.3 metres from 1.5 metres to 112.8 metres, including a higher grade interval of 0.51% Cu, 0.13 g/t Au and 2.24 g/t Ag (0.62% CuEq) over 59.4 metres from 1.5 metres to 60.9 metres.
- RC-AXE-25-016 which intersected 0.27 % Cu, 0.05g/t Au and 2.54 g/t Ag (0.33% CuEq) over 96 metres from 4.6 metres to 100.6 metres.
- RC-AXE-25-006 which intersected 0.26 % Cu, 0.06g/t Au and 0.99 g/t Ag (0.30% CuEq) over 147.8 metres from 4.6 metres to 152.4 metres, including 0.37% Cu, 0.09 g/t Au and 1.34 g/t Ag (0.44% CuEq) over 51.8 metres from 61 metres to 112.8 metres.
- Further drill results, including from the West and Adit Zones, are expected in Q3. At both these zones substantial near-surface, high-grade mineralization was intersected in past drilling.
- The 2025 drill results will be used to develop a Mineral Resource Estimate (“MRE”) for the South, West and Adit Zones, expected in Q4. Together with the MRE for the Gate, Ketchan, Man and Dillard Zones released in Q2 (news release June 25, 2025) this will complete the initial MRE for the MPD Project.
- The 2025 drill program at MPD totalled 5,003 metres in 31 RC drill holes (3,598 metres) and 13 diamond drill holes (1,405 metres) and was successfully completed on time and on budget. Field work for the remainder of the season is focused on detailed geological mapping, prospecting and geological investigation around known zones and priority targets, including VRIFY Areas of Interest.
Conti ue reading at Kodiak Copper
—



