204-615-0335

Giant Mining Intersects High-Grade Copper at Majuba Hill: 169.5 ft of 0.41% Cu Including 40 ft of 1.36% Cu and 10 ft at 4.36% Cu, Highlighting Expansion Potential

Giant Mining Corp. (CSE: BFG | OTC: BFGFF | FWB: YW5) (CSE:BFG.WT.A) (“Giant Mining” or the “Company”) is pleased to announce the results for core hole MHB-32 (“MHB-32”), the first of five holes completed during Phase 1 of the Spring 2025 diamond drilling program (“Core Program”) at the Majuba Hill Porphyry Copper-Silver-Gold Project (“Majuba Hill”), located in Pershing County, Nevada.

MHB-32 intersected two significant copper mineralized zones within a broader interval of 379.5 feet (115.7 m) grading 0.33% Cu and 16.97 ppm Ag, from 510 to 889.5 feet (155.5 to 271.1 m). These results extend the known mineralization deeper and further north than previous drilling. The two key intervals, detailed in Table 1, are:

  • 85 feet (25.9 m) at 0.64% Cu and 50.89 ppm Ag from 510 to 595 feet (155.5 to 181.4 m)
  • 169.5 feet (51.7 m) at 0.41% Cu and 9.51 ppm Ag from 720 to 889.5 feet (219.5 to 271.1 m), including:
    • 40 feet (12.2 m) at 1.36% Cu and 13.33 ppm Ag from 780 to 820 feet (237.7 to 249.9 m), containing a higher-grade section of:
    • 10 feet (3.0 m) at 36% Cu and 35.65 ppm Ag from 805 to 815 feet (245.4 to 248.4 m

Continue at Giant Mining